JS.QA logo
العربية
mukafa
SKU: 603001000003569OA
Only 1 LeftOnly 1 Left
Withings

Withings Smart Weighing Scale |WBS04 (Open Piece - A Grade)

SKU:603001000003569OA

Description

Overview

  • PRE-OWNED UNIT
  • Click here to view terms and conditions for pre-owned unit
  • This product is Jumbo Certified and has a 6-month warranty from the date of purchase.

Specifications Overview

  • Body Composition Measurement: Measures not only weight but also body fat percentage, muscle mass, water percentage, and bone mass for a comprehensive health analysis.
  • Smartphone Connectivity: Syncs with the Withings Health Mate app via Bluetooth, allowing you to track and monitor your progress over time on your smartphone.
  • Automatic Sync: Automatically syncs data to the app, so you don’t need to manually input measurements. Your stats are instantly updated after each weigh-in.
  • High Accuracy: Equipped with advanced sensors to provide precise and accurate weight and body composition measurements.
  • Multi-User Support: Recognizes up to 8 users, making it suitable for family use, and automatically tracks the progress of each individual.
  • Large, Clear Display: Features a large LCD display that shows your weight clearly, making it easy to read even from a distance.
  • Sync with Other Health Apps: The scale integrates with other popular fitness and health apps like Apple Health, Google Fit, and MyFitnessPal for a complete wellness picture.
  • Multi-Platform Compatibility: Works with both iOS and Android devices, ensuring compatibility with a wide range of smartphones and tablets.
  • Long Battery Life: Runs on long-lasting batteries, reducing the need for frequent replacements and offering convenience for daily use.
  • Sleek and Modern Design: The scale has a slim, minimalist design that complements any bathroom or living space while being durable and easy to clean.
Delivered by JS.QA

Delivered by JS.QA

Cash on Delivery

Cash on Delivery

14 Day Return

14 Day Return

Free Shipping

Free Shipping

Specifications

  • Capacity
    180kg/100g
  • Power (W)
    Battery Operated
Out of stock
QAR 299.00
Total price
QAR 299.00
Out of stock
QA
+974
jumboCoin

Get 1 Mukafa Points for every QAR 1 spent.